How much does it cost to charge a Toyota bZ or bZ4X?

A full charge for a 2026 Toyota bZ FWD, larger battery costs about $14.70 at home, at the US average residential electricity rate of 18¢/kWh. A 2023–2025 Toyota bZ4X costs $12.70 to $13.19 to fill at the same rate, depending on version.
That full charge draws roughly 82 kWh from the wall and buys 314 miles of EPA-rated range — about $0.047 a mile. Filling up the 2026 Toyota bZ costs $10.08 in Idaho, the cheapest state, and $27.15 in California.
$14.70
to charge a Toyota bZ from empty at the US average electricity rate
Toyota bZ or bZ4X charging cost calculator
Put in the rate from your electricity bill — the energy charge plus any delivery charge billed per kWh — and every figure below reprices to it. They start at the US average of 18¢/kWh and 12,000 miles a year.
- Per mile
- $0.047
- Per 100 miles
- $4.68
- Per month
- $47
- Per year
- $562
Per month and per year at 12,000 miles a year, spread evenly across twelve months.
One of the boxes above is empty or out of range.
What it costs to charge a 2023–2025 Toyota bZ4X
At the US average rate of 18¢/kWh, a full charge of a 2023–2025 Toyota bZ4X costs $12.70 to $13.19 depending on version, against $14.70 for the 2026 Toyota bZ above. Per 100 miles it runs $5.04 to $5.94, against $4.68.
Every bZ4X uses more energy per mile than the 2026 bZ — from 8% more for the front-wheel-drive car to 27% more for a 2023 or 2024 Limited AWD — but costs less to fill, because its shorter range takes fewer kWh to cover. The front-wheel-drive bZ4X was rated 28 kWh per 100 miles in all three model years and is the cheapest version to run. All-wheel drive added three to five kWh per 100 miles, and for 2025 the EPA rated it by wheel size: 31 on 18-inch wheels, 32 on 20-inch.
| Version | kWh/100mi | EPA range | Full charge | Per 100 miles | Per month |
|---|---|---|---|---|---|
| 2023–2025 FWD | 28 | 252 mi | $12.70 | $5.04 | $50 |
| 2023 Limited FWD | 30 | 242 mi | $13.07 | $5.40 | $54 |
| 2024–2025 Limited FWD | 30 | 236 mi | $12.74 | $5.40 | $54 |
| 2023–2024 AWD | 32 | 228 mi | $13.13 | $5.76 | $58 |
| 2025 AWD, 18-inch wheels | 31 | 228 mi | $12.72 | $5.58 | $56 |
| 2025 AWD, 20-inch wheels | 32 | 222 mi | $12.79 | $5.76 | $58 |
| 2023–2024 Limited AWD | 33 | 222 mi | $13.19 | $5.94 | $59 |
| 2025 Limited AWD | 32 | 222 mi | $12.79 | $5.76 | $58 |
What it costs at three real electricity rates
Your rate is the only input that really moves this number, so here is the same car at three real ones — the cheapest state, the national average, and the most expensive large mainland market.
| Electricity rate | Full charge | Per 100 miles | Per month | Per year at 12,000 mi |
|---|---|---|---|---|
| 12.35¢ · Idaho | $10.08 | $3.21 | $32 | $385 |
| 18¢ · US average | $14.70 | $4.68 | $47 | $562 |
| 33.25¢ · California | $27.15 | $8.65 | $86 | $1,037 |
What it costs per mile
A Toyota bZ costs about $0.047 a mile to charge at home at the US average electricity rate, or $4.68 per 100 miles. That is energy only — the EPA rates this car at 26 kWh per 100 miles measured at the wall socket, so charging losses are already inside the figure and should not be added again.
What it adds to your electricity bill
Charging a Toyota bZ at home adds about $47 a month to your electricity bill at the US average rate, driving 12,000 miles a year. That is the yearly cost of $562 spread evenly across twelve months — a month with a road trip in it costs more, and a quiet one costs less.
Nothing else on the bill changes: the car draws the same kilowatt-hours whatever else is running in the house, so the increase is the charging and nothing more.
Where the numbers come from
The EPA rates this FWD, larger battery at 26 kWh per 100 miles with 314 miles of combined range. Those two figures together give the energy for a full charge, which is where the 82 kWh above comes from.
We work it out that way rather than quoting a battery size on purpose. Manufacturers publish gross capacity, which includes a buffer at each end of the pack that never takes a charge, so a cost built on it overstates your bill. And the EPA measures at the wall socket rather than at the battery, so charging losses are already inside the figure — no need to add them, and adding them would count the same loss twice.
What this means for this car
The bZ is the renamed and reworked bZ4X, and the 2026 numbers are the story: 314 miles of EPA range and 26 kWh per 100 miles, which puts a Toyota within one kWh of the Teslas at the top of this list. The choice between its two batteries is unusual in that it is purely about range. Both versions round to the same 26 kWh per 100 miles, so the smaller battery’s 236 miles cost the same per mile as the larger one’s 314 — you are buying distance between charges, not cheaper driving. All-wheel drive is rated 28 kWh per 100 miles with 288 miles of range, about 8% more energy per mile, and the Woodland is rated 29 or 31 depending on its tires. For a car whose badge was a punchline two years ago, the running-cost math is now among the best here.
How it compares
| Per 100 miles | Per year | |
|---|---|---|
| Toyota bZ | $4.68 | $562 |
| A mid-pack EV at 30 kWh/100mi | $5.40 | $648 |
| A 30 MPG gas car at $4.05/gal | $13.50 | $1,620 |
Common questions
How much does it cost to charge a Toyota bZ?
At the US average of about 18¢/kWh, a full charge covering its 314-mile EPA range costs roughly $15 at home. Your own electricity rate decides the real figure.
Is the bigger bZ battery more expensive to run per mile?
No — both battery versions are EPA-rated at the same 26 kWh per 100 miles, so a mile costs the same in each. The larger battery buys you 314 miles of range instead of 236, not cheaper driving.